The Technische Hochschule Mittelhessen has commissioned two new gas turbine test benches in Friedberg. The facilities will be used in research and teaching at the Department of Mechanical Engineering, Mechatronics, and Materials Technology, primarily in the Master's program. They cost approximately €200,000 in total.
The core element of the "MGT-30" test rig is a micro gas turbine that converts thermal energy from the combustion of natural gas into electricity with a power output of up to 30 kilowatts. The "STW-100" consists of an aircraft gas turbine mounted in a thrust measuring device. Fueled by kerosene, it achieves a thrust of 100 newtons.
According to Prof. Dr. Roland Dückershoff, head of the Gas Turbine Laboratory, the acquired equipment represents the current state of the art on the development test benches of the gas turbine industry, for example at Rolls Royce, Siemens, or Alstom. It is equipped with highly precise technology for measuring thermodynamic parameters such as pressure and temperature. The measurement signals are read, processed, and analyzed using a modern programming system.
Students played a key role in the planning, construction, instrumentation, and programming of the new laboratory equipment. Laboratory engineers Günther Kavelmacher and Andreas Böhm supervised the work.